Introduction to the installation steps of bucket elevator conveyor

Introduction to the installation steps of bucket elevator conveyor

(Summary description)The bucket elevator conveyor has the advantages of large conveying capacity, high lifting height, stable and reliable operation, and long service life. Here's how to install it correctly.

Introduction to the installation steps of bucket elevator conveyor

(Summary description)The bucket elevator conveyor has the advantages of large conveying capacity, high lifting height, stable and reliable operation, and long service life. Here's how to install it correctly.

Information

The bucket elevator conveyor has the advantages of large conveying capacity, high lifting height, stable and reliable operation, and long service life. Here's how to install it correctly.

good price and quality bucket elevator conveyor china
installation steps:
1. The bucket elevator conveyor must be firmly installed on a solid concrete foundation. The surface of the concrete foundation should be flat and horizontal to ensure that the bucket elevator conveyor meets the vertical requirements after installation. The middle casing and upper casing of the bucket elevator conveyor with a higher height should be connected with adjacent buildings (such as silos, workshops, etc.) in order to increase its stability. When installing, install the lower parts first, fix the anchor bolts, then install the middle casing, and then install the upper casing. The casing is installed successfully, and the verticality is corrected. The error should be less than 10mm when measured with a plumb line above and below the full height. The upper and lower axes should be parallel, and their axis lines should be in the same plane. When installing the bucket elevator conveyor with a lower height, the upper, middle and lower casings can be connected and aligned at the ground level, and then the whole can be hung upright and fixed on the concrete foundation.
2. After the casing is installed, install the chain and hopper. The U-shaped screw used for the connection of the hopper is not only the chain joint, but also the fixing part of the hopper. The nuts of the U-shaped screws must be tightened and reliably prevented from loosening.
3. After the chain and hopper are installed, tension them properly.
4. Add an appropriate amount of engine oil and butter to the reducer and bearing seat respectively. The reducer is lubricated with industrial gear oil. Calcium-based or sodium-based butter can be used in the bearing seat.
5. Trial run, after the installation of the bucket elevator conveyor is completed, the empty car trial run should be carried out. Attention should be paid to dry running: no reverse, no bumping. The idling operation should not be less than 2 hours, there should be no overheating phenomenon, the temperature rise of the bearing should not exceed 250C, and the temperature rise of the reducer should not exceed 300C. After 2 hours of dry running, everything is normal and the load test can be carried out. The feeding should be uniform during the test run with load to prevent excessive feeding, which may block the lower part and cause "stuffy car".

Keyword:

Scan the QR code to read on your phone

Breaking 2024-04-18

Breaking Barriers: Unleashing the Potential of Feed Silos in Warehousing

Discover how feed silos can revolutionize the warehousing industry, optimize storage space, and streamline operations. Learn about the benefits, uses, and best practices of incorporating feed silos in
See more information
Maximizing 2024-04-15

Maximizing Efficiency with Feed Silos in the Transportation and Storage Industry

Discover how feed silos can revolutionize the way goods are stored and transported in the transportation and storage industry. From optimizing space utilization to streamlining operations, feed silos
See more information
Maximizing 2024-04-12

Maximizing Efficiency and Safety: How Feed Silos Transform the Transportation Industry

Explore the innovative ways in which feed silos are revolutionizing the transportation industry, enhancing efficiency, and ensuring safety for all involved.
See more information
How 2024-03-25

How to Improve Cleanliness: Effective Dust Control Measures for Cement Bucket Elevators

Learn the best strategies and techniques to enhance cleanliness and control dust in cement bucket elevators. Discover practical tips and solutions for maintaining a clean and efficient industrial envi
See more information
Everything 2024-03-22

Everything You Need to Know About Cement Bucket Elevators

Explore the essential information about cement bucket elevators in the industrial equipment and components - chain and conveyor equipment - elevators industry. Learn about their functions, benefits, a
See more information
The 2024-03-19

The Cost-Saving Benefits of Investing in a Cement Bucket Elevator

Discover how investing in a cement bucket elevator can lead to significant cost savings for your industrial equipment and components business. Learn about the advantages of this innovative technology
See more information
On Line
Telephone communication
Service time:
8:30 - 19:00
Advisory
在线客服
Hi, how can I help you?Tina Ye
Luwei

Scan and follow Lu Wei

Xianghao

Scan and follow Xiang Hao

志翔

Scan and follow Zhi Xiang

Xiamen Luwei Prefabricated

Steel Structure Co., Ltd Ltd.

 Service Hotline:

+86 592-7072928 / +86 18150889219 (Tina Ye) (Overseas)

E-mail:tina.ye@xmlwjx.com

Registered address of the company:

Office Building 3rd Floor, No.608, Xinxia

South Road, Xinxu Town, Xiang'an District, Xiamen City

Factory Address:

            E3 workshop, Factory 2nd Floor, No.608, Xinxia South Road, Xinxu Town, Xiang'an District, Xiamen City

Page Copyright: Xiamen Luwei Prefabricated Steel Structure Co., Ltd Ltd.   闽ICP备10205934号  

Friendly Link: Alibaba