头部邮箱+阿里巴巴

Time of issue:2021-03-05 15:21:05

Welcome to Luwei official website!Tel:+86-592-7072928 E-mail: tina.ye@xmlwjx.com   

language
中国
韩国
韩国
韩国
韩国
韩国
搜索
Search
img

阿根廷CCL/LB项目

水利项目散料贮存和输送解决方案(致力于散料储存输送成套设备的研发制造)

img

三航4500T筒仓

码头散料中转解决方案(面向市场,贴近需求)

img

福平铁路6个800T筒仓

桥隧工程项目散料贮存和输送解决方案(精工制造,质量为先)

img

阿曼水泥存储项目

低压气力粉料中转输送解决方案(创新驱动,人才为本 )

img

澳大利亚V7项目

矿山散料储存输送解决方案(打造品牌,绿色环保)

Product Center

A high-tech enterprise focusing on the business operation and development of complete sets of bulk storage and transportation equipment and overall solutions

NE/NSE/TDG系列
皮带机、气力输送成套设备(50-120T/H)、除尘器
设备钢结构的加工制作介于普通结构件(对加工要求不高)与精密机械加工(要求加工较精细)之间,采用焊接或者栓接的连接方式,属于钢结构范畴。

Solution

Luwei Machinery's bulk material storage and transfer system and solutions have been iteratively updated in recent years, becoming more intelligent, flexible and superior in performance.

Scheme of Wharf Bulk Material Transfer Station
Bulk materials arrive at wharf by water transportation, and are sent to  assembling steel silos for storage by pneumatic conveyor/belt conveyor/ship unloader/bulk truck transfer/chute/elevator, etc., and then distributed to all parts of the region by cement tanker or connected with wrapping machine for sale as bagged materials. 

Scheme of Hydraulic Project Bulk Material Transfer
Newly-built hydraulic projects are usually built in relatively remote places. It is difficult to transport raw materials such as cement, fly ash, sand and gravel. It is usually necessary to build large-capacity assembling steel silos, which can be centralized and one-time transportation and used for a relatively long period. The material can be directly transported to the destination through inclined belts, pneumatic conveying, etc.

Scheme of Mixing Station Bulk Material and Batching Transfer
In the mixing station system, assembling steel silos are usually used as intermediate storage containers for batching. Bulk materials are transported to assembling steel silos by bulk trucks, belts, etc., and to measurement equipment by means of screw conveyor, belt conveyors, etc. for mixing.

Scheme of Mine Bulk Material Storage and Transportation
Ores are transported to raw material storage through mining and transportation. Then it is transported to crushing machinery (coarse crushing and fine crushing) by belt, then to finished product storage bin by belt conveyor and elevator, etc. Finally, it is transported and sold by truck. If necessary, the crushed granules are transported to finished product bin by flour mill, and then sold by bulk truck.

Scheme of Factory Bulk Material Storage and Transportation
For the storage and transportation scheme of bulk materials in the factory, raw materials arrive at the factory by bulk trucks. And it is transported to the raw material storage bin by dump-elevator or compressed air, then to the measurement equipment by belt conveyor or screw conveyor. And the raw materials are stirred, mixed and bagged after accurate measurement, and sent to the finished product storage bin by discharging equipment or bagged and sold by automatic packaging palletizer.

Scheme of Train Bulk Material Transfer
Bulk materials arrive at the station by train, are sent to assembling steel silos for storage by pneumatic conveyor/belt conveyor/screw conveyor and elevator, and then distributed to all parts of the region by tanker and received by wrapping machine, sold as bagged materials, or delivered to the destination by truck.

Project case

Provide products and services to leading domestic and foreign high-end construction machinery companies such as Liebherr, Gezhouba Group, Nanfang Road Machinery, New Building Materials Design and Research Institute, etc.

About Lu Wei

Xiamen Luwei Prefabricated Steel Structure Co., Ltd is one of holding enterprise of Xiamen Zhixiang Industrial Co., Ltd. It was established in June 2010. Its head office is located in Xiang’an District with R&D and production factory of about 20,000 square meters. Luwei company has obtained ISO9001 Quality Management System Certification. Luwei has devoted itself to R&D and precision manufacturing of bulk material storage and conveying complete equipment.

5cd598da9bceebf08520de7a9f9f1373
  • 2010

    Year

    The company was founded in 2010

  • 20000

    Plant area

  • 8000

    +

    Cooperation projects

News

Products are exported to Japan, Saudi Arabia, Qatar, South Africa, Britain, Norway, Russia, Argentina, Uruguay, Bolivia and other parts of the world

On Line
Telephone communication
Service time:
8:30 - 19:00
Advisory
在线客服
Hi, how can I help you?Tina Ye
Luwei

Scan and follow Lu Wei

Xianghao

Scan and follow Xiang Hao

志翔

Scan and follow Zhi Xiang

Xiamen Luwei Prefabricated

Steel Structure Co., Ltd Ltd.

 Service Hotline:

+86 592-7072928 / +86 18150889219 (Tina Ye) (Overseas)

E-mail:tina.ye@xmlwjx.com

Registered address of the company:

Office Building 3rd Floor, No.608, Xinxia

South Road, Xinxu Town, Xiang'an District, Xiamen City

Factory Address:

            E3 workshop, Factory 2nd Floor, No.608, Xinxia South Road, Xinxu Town, Xiang'an District, Xiamen City

Page Copyright: Xiamen Luwei Prefabricated Steel Structure Co., Ltd Ltd.   闽ICP备10205934号  

Friendly Link: Alibaba