Image name

Solution


The production department organizes a competition for tailor-welding team leaders


According to our company's 2022 work goals and organizational structure adjustments, on the morning of Dec. 16, the production department successfully completed the selection and appointment of the assembly and welding team leaders. Elect 2 assembly team leaders and 1 welding team leader.

The team leader is the most basic-level manager and the decoder who produces all the instructions. He has to manage both technology and safety, as well as people and affairs. The main purpose of this competition is to break the irrational allocation of more officers and fewer soldiers, to seek better and strong generals, to select grass-roots managers with both ability and political integrity, and to put people who can manage and are willing to manage.

 

The event started in early December. First of all, the head of the production department organized the current tailor welding team leader, deputy leader and technicians to communicate, communicated the content of the competition plan, changed the unreasonable management status, and the team leader competed for employment, which received unanimous support from everyone; Dec. 14th The skills and management theory exams for competitive personnel were organized on Japan; on Dec. 16th, a competitive speech event was organized.

 

Everyone who participated in the competition for speech activities started talking about 5S, talked about how to lead the team, how to improve production efficiency, how to control cost, safety, quality and progress, how to educate people, how to do internal performance, etc., and put forward Personal thoughts and suggestions. Talking about some good management ideas and working methods from time to time, the judges' tacit approval and applause encouragement.

 

"The capable, the equal, the mediocre" is the company's employment principle. Through this competition, Lu Wei's production department is believed to be able to build a production team with strong execution, courage to take responsibility, high efficiency, enterprising, tenacity and self-confidence.

 

On the afternoon of Dec.11th, the Production Department organized a communication meeting for competition activities

 

 

On the afternoon of Dec. 14th, participate in the theoretical examination of the candidates

 

 

On the morning of Dec.16th, employee Chen Jianquan gave a speech on competition

 

 

On the morning of Dec.16th, employee Ren Zechun gave a speech on competition

 

 

On the morning of Dec.16th, employee Zhen Yuanwei gave a speech on competition

 

 

The judges and employee representatives earnestly score

 

 

Mr. Ye Qisheng made a summary

 

 

Senior customer Mr. Xie shared his management experience at the grassroots level

More solutions


Batching plant bulk material transfer scheme

In batching plant systems, assembled steel silos are often required as intermediate storage containers for ingredients. Bulk materials are transported to these assembled steel silos by bulk trucks, belts, etc., and then conveyed to the weighing scales via screw conveyors, belt conveyors, etc., for mixing.


Factory Bulk Material Storage and Conveying Solutions

Factory bulk material storage and conveying solution: Raw materials arrive at the factory by bulk trucks or other means, and are conveyed to the raw material storage silo via dump-lift or compressed air. They are then transported to the metering equipment via belt conveyor or screw conveyor. After precise metering, they are mixed or bagged, and sent to the finished product storage silo via discharge equipment, or bagged for sale after packaging by an automatic packaging and palletizing machine.


Hydropower project bulk material transfer scheme

New hydropower projects are usually built in relatively remote areas, making it difficult to transport raw materials such as cement, fly ash, and sand and gravel. Large-capacity prefabricated steel plate silos are usually needed for centralized transportation, allowing for a single delivery to cover a longer period. The materials are then directly transported to the point of use via inclined belts, pneumatic conveying, and other methods.


Train Bulk Material Transfer Scheme Diagram

Bulk materials are delivered to the site by train, and then transported via pneumatic conveying/belt conveying/screw conveyors and elevators, etc., to assembled steel silos for storage. From there, they are distributed to various locations in the region by tanker trucks, or connected to a bagging machine for sale as bagged materials, or transported by truck to the point of use.


Port Bulk Material Transfer Station Solution

Bulk materials arrive at the terminal by water, and are then transported to assembled steel plate silos for storage via pneumatic conveying, belt conveying, ship unloaders, bulk truck transfer, chutes, elevators, etc. Afterwards, they are distributed throughout the region by cement tankers or connected to packaging machines for sale as bagged materials.


Mine Bulk Material Storage and Transportation Solution

Ore raw materials are transported through mining to raw material storage silos or stockyards, then transported via conveyor belts to crushing machinery (coarse crushing, fine crushing), and then transported by belt conveyors/hoists or other means to finished product storage silos or processing equipment, finally transported by truck or packaged for sale. If necessary, the crushed granular material is then ground into powder by a pulverizer and transported to the finished product warehouse, then sold via bulk trucks or after packaging.