Image name

Solution


Work diligently, serve diligently——our company passed the quality inspection of New Zealand customers' products at one time


Work diligently, serve diligently——our company passed the quality inspection of New Zealand customers' products at one time

On November 15th, SGS testing agency represented New Zealand customers to our company to test the welding quality of coffee bean jar holders, mixer holders and aisle holders.

Combining previous testing experience, the personnel of the production department separated the tested products in advance and placed them in an orderly and orderly manner, greatly shortening the handling time of the testing process, and the originally planned two-day testing arrangement was shortened to one day.

After one day's inspection, the inspector determinations that the welding process meets the quality requirements of the product, and the appearance is clean, and all of them are qualified.

 

详情图片

The company's quality control and SGS inspectors carefully inspect every detail

 

详情图片

The products to be inspected are placed neatly, shortening the inspection time

 

Picture of the detection process

More solutions


Batching plant bulk material transfer scheme

In batching plant systems, assembled steel silos are often required as intermediate storage containers for ingredients. Bulk materials are transported to these assembled steel silos by bulk trucks, belts, etc., and then conveyed to the weighing scales via screw conveyors, belt conveyors, etc., for mixing.


Factory Bulk Material Storage and Conveying Solutions

Factory bulk material storage and conveying solution: Raw materials arrive at the factory by bulk trucks or other means, and are conveyed to the raw material storage silo via dump-lift or compressed air. They are then transported to the metering equipment via belt conveyor or screw conveyor. After precise metering, they are mixed or bagged, and sent to the finished product storage silo via discharge equipment, or bagged for sale after packaging by an automatic packaging and palletizing machine.


Hydropower project bulk material transfer scheme

New hydropower projects are usually built in relatively remote areas, making it difficult to transport raw materials such as cement, fly ash, and sand and gravel. Large-capacity prefabricated steel plate silos are usually needed for centralized transportation, allowing for a single delivery to cover a longer period. The materials are then directly transported to the point of use via inclined belts, pneumatic conveying, and other methods.


Train Bulk Material Transfer Scheme Diagram

Bulk materials are delivered to the site by train, and then transported via pneumatic conveying/belt conveying/screw conveyors and elevators, etc., to assembled steel silos for storage. From there, they are distributed to various locations in the region by tanker trucks, or connected to a bagging machine for sale as bagged materials, or transported by truck to the point of use.


Port Bulk Material Transfer Station Solution

Bulk materials arrive at the terminal by water, and are then transported to assembled steel plate silos for storage via pneumatic conveying, belt conveying, ship unloaders, bulk truck transfer, chutes, elevators, etc. Afterwards, they are distributed throughout the region by cement tankers or connected to packaging machines for sale as bagged materials.


Mine Bulk Material Storage and Transportation Solution

Ore raw materials are transported through mining to raw material storage silos or stockyards, then transported via conveyor belts to crushing machinery (coarse crushing, fine crushing), and then transported by belt conveyors/hoists or other means to finished product storage silos or processing equipment, finally transported by truck or packaged for sale. If necessary, the crushed granular material is then ground into powder by a pulverizer and transported to the finished product warehouse, then sold via bulk trucks or after packaging.