Introduction to the installation steps of bucket elevator conveyor


The bucket elevator conveyor has the advantages of large conveying capacity, high lifting height, stable and reliable operation, and long service life. Here's how to install it correctly.

good price and quality bucket elevator conveyor china
installation steps:
1. The bucket elevator conveyor must be firmly installed on a solid concrete foundation. The surface of the concrete foundation should be flat and horizontal to ensure that the bucket elevator conveyor meets the vertical requirements after installation. The middle casing and upper casing of the bucket elevator conveyor with a higher height should be connected with adjacent buildings (such as silos, workshops, etc.) in order to increase its stability. When installing, install the lower parts first, fix the anchor bolts, then install the middle casing, and then install the upper casing. The casing is installed successfully, and the verticality is corrected. The error should be less than 10mm when measured with a plumb line above and below the full height. The upper and lower axes should be parallel, and their axis lines should be in the same plane. When installing the bucket elevator conveyor with a lower height, the upper, middle and lower casings can be connected and aligned at the ground level, and then the whole can be hung upright and fixed on the concrete foundation.
2. After the casing is installed, install the chain and hopper. The U-shaped screw used for the connection of the hopper is not only the chain joint, but also the fixing part of the hopper. The nuts of the U-shaped screws must be tightened and reliably prevented from loosening.
3. After the chain and hopper are installed, tension them properly.
4. Add an appropriate amount of engine oil and butter to the reducer and bearing seat respectively. The reducer is lubricated with industrial gear oil. Calcium-based or sodium-based butter can be used in the bearing seat.
5. Trial run, after the installation of the bucket elevator conveyor is completed, the empty car trial run should be carried out. Attention should be paid to dry running: no reverse, no bumping. The idling operation should not be less than 2 hours, there should be no overheating phenomenon, the temperature rise of the bearing should not exceed 250C, and the temperature rise of the reducer should not exceed 300C. After 2 hours of dry running, everything is normal and the load test can be carried out. The feeding should be uniform during the test run with load to prevent excessive feeding, which may block the lower part and cause "stuffy car".

More solutions


Batching plant bulk material transfer scheme

In batching plant systems, assembled steel silos are often required as intermediate storage containers for ingredients. Bulk materials are transported to these assembled steel silos by bulk trucks, belts, etc., and then conveyed to the weighing scales via screw conveyors, belt conveyors, etc., for mixing.


Factory Bulk Material Storage and Conveying Solutions

Factory bulk material storage and conveying solution: Raw materials arrive at the factory by bulk trucks or other means, and are conveyed to the raw material storage silo via dump-lift or compressed air. They are then transported to the metering equipment via belt conveyor or screw conveyor. After precise metering, they are mixed or bagged, and sent to the finished product storage silo via discharge equipment, or bagged for sale after packaging by an automatic packaging and palletizing machine.


Hydropower project bulk material transfer scheme

New hydropower projects are usually built in relatively remote areas, making it difficult to transport raw materials such as cement, fly ash, and sand and gravel. Large-capacity prefabricated steel plate silos are usually needed for centralized transportation, allowing for a single delivery to cover a longer period. The materials are then directly transported to the point of use via inclined belts, pneumatic conveying, and other methods.


Train Bulk Material Transfer Scheme Diagram

Bulk materials are delivered to the site by train, and then transported via pneumatic conveying/belt conveying/screw conveyors and elevators, etc., to assembled steel silos for storage. From there, they are distributed to various locations in the region by tanker trucks, or connected to a bagging machine for sale as bagged materials, or transported by truck to the point of use.


Port Bulk Material Transfer Station Solution

Bulk materials arrive at the terminal by water, and are then transported to assembled steel plate silos for storage via pneumatic conveying, belt conveying, ship unloaders, bulk truck transfer, chutes, elevators, etc. Afterwards, they are distributed throughout the region by cement tankers or connected to packaging machines for sale as bagged materials.


Mine Bulk Material Storage and Transportation Solution

Ore raw materials are transported through mining to raw material storage silos or stockyards, then transported via conveyor belts to crushing machinery (coarse crushing, fine crushing), and then transported by belt conveyors/hoists or other means to finished product storage silos or processing equipment, finally transported by truck or packaged for sale. If necessary, the crushed granular material is then ground into powder by a pulverizer and transported to the finished product warehouse, then sold via bulk trucks or after packaging.