Image name

Solution


What are the requirements for the material of vertical bucket conveyor


The vertical bucket conveyor product is suitable for lifting from low to high. After the supply material is put into the hopper through the vibrating table, the machine automatically transports upwards one after another. The conveying speed can be changed according to the conveying volume, and the height can be selected as required. If the vertical bucket conveyor is unnecessary for a period of time and needs to be disassembled and stored, what should we pay attention to when disassembling it? The use of vertical bucket conveyors in the production process is not used every day, often after a period of use, it is necessary to change the position or move into the room. At this moment, it is necessary to disassemble the vertical bucket conveyor equipment.

Cheap vertical bucket conveyor Manufacturers china
How to carry out safe and orderly disassembly work, and how to ensure that "installation under" does not affect the normal operation of the equipment. When disassembling a shovel machine, the first thing to keep in mind is safety. Before dismantling the shovel vertical bucket conveyor, the person in charge needs to make a plan according to the equipment drawings, and write down the written regulations on the dismantling of the shovel vertical bucket conveyor, the rear equipment, the order and the new location. Operators need to increase bucket-style drive and employ inflow feed, induction discharge, and a dense arrangement of high-capacity hoppers. When the material is raised, there is no material return and material excavation, so the inactive power is small; this type of machine has lower requirements on the type and characteristics of the material, and can not only change the general powder and small granular materials, but also change the material's High wear resistance, good sealing performance, less environmental pollution; good operational reliability.
Advanced design principles and processing methods ensure the reliability of the whole machine. Improve the running smoothness of the machine and make it reach a higher height; long service life, the machine feed reaches the change, and the inflow type is adopted. There is no need to use bucket material for digging, and there is little pinching and collision between materials. The vertical bucket conveyor is maintained and managed by designated personnel, and the key of the power switch box is managed by designated personnel.
Vertical bucket conveyors need to have lift limiters and travel limiters. The stopper should automatically stop the pulley before raising it to 300 mm of the spacer drum or pulley. Bucket machines should have large load marks. The weight must not be overloaded when the load is raised or lowered. After power-on, check the safety devices such as lift limiter, travel limiter and interlock switch, and the operation is reliable and reliable. You can drive after the bell before hoisting the crane and landing. People are not allowed to move up and down. After operation, increase the machine hanging plate should be grounded, then block the power supply, and close the upper and lower guardrail doors. Always insist on changing the sanitary conditions of the machine.

More solutions


Batching plant bulk material transfer scheme

In batching plant systems, assembled steel silos are often required as intermediate storage containers for ingredients. Bulk materials are transported to these assembled steel silos by bulk trucks, belts, etc., and then conveyed to the weighing scales via screw conveyors, belt conveyors, etc., for mixing.


Factory Bulk Material Storage and Conveying Solutions

Factory bulk material storage and conveying solution: Raw materials arrive at the factory by bulk trucks or other means, and are conveyed to the raw material storage silo via dump-lift or compressed air. They are then transported to the metering equipment via belt conveyor or screw conveyor. After precise metering, they are mixed or bagged, and sent to the finished product storage silo via discharge equipment, or bagged for sale after packaging by an automatic packaging and palletizing machine.


Hydropower project bulk material transfer scheme

New hydropower projects are usually built in relatively remote areas, making it difficult to transport raw materials such as cement, fly ash, and sand and gravel. Large-capacity prefabricated steel plate silos are usually needed for centralized transportation, allowing for a single delivery to cover a longer period. The materials are then directly transported to the point of use via inclined belts, pneumatic conveying, and other methods.


Train Bulk Material Transfer Scheme Diagram

Bulk materials are delivered to the site by train, and then transported via pneumatic conveying/belt conveying/screw conveyors and elevators, etc., to assembled steel silos for storage. From there, they are distributed to various locations in the region by tanker trucks, or connected to a bagging machine for sale as bagged materials, or transported by truck to the point of use.


Port Bulk Material Transfer Station Solution

Bulk materials arrive at the terminal by water, and are then transported to assembled steel plate silos for storage via pneumatic conveying, belt conveying, ship unloaders, bulk truck transfer, chutes, elevators, etc. Afterwards, they are distributed throughout the region by cement tankers or connected to packaging machines for sale as bagged materials.


Mine Bulk Material Storage and Transportation Solution

Ore raw materials are transported through mining to raw material storage silos or stockyards, then transported via conveyor belts to crushing machinery (coarse crushing, fine crushing), and then transported by belt conveyors/hoists or other means to finished product storage silos or processing equipment, finally transported by truck or packaged for sale. If necessary, the crushed granular material is then ground into powder by a pulverizer and transported to the finished product warehouse, then sold via bulk trucks or after packaging.