Image name

Solution


How to deal with noise in bucket elevator for cement plant


Recently, a customer asked that the bucket elevator for cement plant always has noise problems, which is annoying. Now I would like to explain the reason why the bucket elevator for cement plant produces noise. It often makes abnormal noise due to the abnormal operation of a certain component. The main parts of the noise are the coupling, the lifting head wheel and the bottom wheel, and the inside of the lifting barrel.

Low price bucket elevator for cement plant from China manufacturer
1. Abnormal noise of the coupling: The abnormal noise emitted by the coupling is sometimes accompanied by vibration noise with the same frequency as the motor's rotation. The bucket elevator for cement plant manufacturer tells you that the main reason for the failure is that the front and rear shafts of the coupling are not concentric. The position of the motor and the reducer should be adjusted in time to ensure that the motor shaft and the reducer shaft are concentric.
2. Abnormal noise of head wheel and bottom wheel: The bucket elevator for cement plant manufacturer tells you that the noise of the head wheel and bottom wheel is very small when they work normally. When abnormal noise occurs, the bearing is damaged due to poor sealing or lubrication. issued. Carefully check the bearing condition of the head wheel and the bottom wheel, if the bearing is damaged, it should be replaced in time.
3. Abnormal noise in the barrel: The main reason for abnormal noise in the barrel is that the hopper is falling off, damaged or loose. In this case, stop immediately, carefully inspect and repair the hopper that is fallen off, damaged or loose. In the daily work, every 500 hours of work of the bucket elevator for cement plant, a comprehensive inspection is carried out to check whether the hopper is in good condition and whether the connection between the hopper and the hopper belt is firm, so as to ensure the stability of the hopper. At the same time, a fence can be installed at the discharge port of the bucket elevator for cement plant to prevent damage to other equipment after the bucket falls off.

More solutions


Batching plant bulk material transfer scheme

In batching plant systems, assembled steel silos are often required as intermediate storage containers for ingredients. Bulk materials are transported to these assembled steel silos by bulk trucks, belts, etc., and then conveyed to the weighing scales via screw conveyors, belt conveyors, etc., for mixing.


Factory Bulk Material Storage and Conveying Solutions

Factory bulk material storage and conveying solution: Raw materials arrive at the factory by bulk trucks or other means, and are conveyed to the raw material storage silo via dump-lift or compressed air. They are then transported to the metering equipment via belt conveyor or screw conveyor. After precise metering, they are mixed or bagged, and sent to the finished product storage silo via discharge equipment, or bagged for sale after packaging by an automatic packaging and palletizing machine.


Hydropower project bulk material transfer scheme

New hydropower projects are usually built in relatively remote areas, making it difficult to transport raw materials such as cement, fly ash, and sand and gravel. Large-capacity prefabricated steel plate silos are usually needed for centralized transportation, allowing for a single delivery to cover a longer period. The materials are then directly transported to the point of use via inclined belts, pneumatic conveying, and other methods.


Train Bulk Material Transfer Scheme Diagram

Bulk materials are delivered to the site by train, and then transported via pneumatic conveying/belt conveying/screw conveyors and elevators, etc., to assembled steel silos for storage. From there, they are distributed to various locations in the region by tanker trucks, or connected to a bagging machine for sale as bagged materials, or transported by truck to the point of use.


Port Bulk Material Transfer Station Solution

Bulk materials arrive at the terminal by water, and are then transported to assembled steel plate silos for storage via pneumatic conveying, belt conveying, ship unloaders, bulk truck transfer, chutes, elevators, etc. Afterwards, they are distributed throughout the region by cement tankers or connected to packaging machines for sale as bagged materials.


Mine Bulk Material Storage and Transportation Solution

Ore raw materials are transported through mining to raw material storage silos or stockyards, then transported via conveyor belts to crushing machinery (coarse crushing, fine crushing), and then transported by belt conveyors/hoists or other means to finished product storage silos or processing equipment, finally transported by truck or packaged for sale. If necessary, the crushed granular material is then ground into powder by a pulverizer and transported to the finished product warehouse, then sold via bulk trucks or after packaging.