头部邮箱+阿里巴巴
Welcome to Luwei official website!Tel:+86-592-7072928 E-mail: tina.ye@xmlwjx.com
Luwei products ——Bucket Elevator Introduction
- Categories:News Center
- Author:
- Origin:
- Time of issue:2021-08-30
- Views:0
(Summary description)The traction component of TGD elevator adopts high-strength steel rope core tape, which overcomes the live loading when the chain is engaged with the sprocket. Easier than chain lifting, able to achieve higher productivity at a faster speed, under the same production conditions, because of its high working speed and lighter weight, the tape can make the line load of the material and the line load of the traction member smaller, thereby reducing the size and weight of the whole machine. At the same time, because the tape has good elasticity and flexibility, it has a vibration damping effect when the hopper is loaded. Due to the use of high-strength steel wire rope core tape, the lifting height and conveying capacity of the hoist can be greatly improved, so this type has a good development prospect.
Luwei products ——Bucket Elevator Introduction
(Summary description)The traction component of TGD elevator adopts high-strength steel rope core tape, which overcomes the live loading when the chain is engaged with the sprocket. Easier than chain lifting, able to achieve higher productivity at a faster speed, under the same production conditions, because of its high working speed and lighter weight, the tape can make the line load of the material and the line load of the traction member smaller, thereby reducing the size and weight of the whole machine. At the same time, because the tape has good elasticity and flexibility, it has a vibration damping effect when the hopper is loaded. Due to the use of high-strength steel wire rope core tape, the lifting height and conveying capacity of the hoist can be greatly improved, so this type has a good development prospect.
- Categories:News Center
- Author:
- Origin:
- Time of issue:2021-08-30
- Views:0
TGD Steel-wire belt bucket elevator
The traction component of TGD elevator adopts high-strength steel rope core tape, which overcomes the live loading when the chain is engaged with the sprocket. Easier than chain lifting, able to achieve higher productivity at a faster speed, under the same production conditions, because of its high working speed and lighter weight, the tape can make the line load of the material and the line load of the traction member smaller, thereby reducing the size and weight of the whole machine. At the same time, because the tape has good elasticity and flexibility, it has a vibration damping effect when the hopper is loaded. Due to the use of high-strength steel wire rope core tape, the lifting height and conveying capacity of the hoist can be greatly improved, so this type has a good development prospect.
TGD Steel-wire belt bucket elevator technical parameters
TGD bucket elevator(with Sh type hopper)
TGD bucket elevator(with Zh type hopper)
Asphalt special elevator(NSE)
There are two types of elevator used in asphalt stations, one is use to conveyor stone material, called Stone elevator; Another one is use to conveyor powder material, called powder elevator. Both of them adopts the special type of NSE series, reliable performance improvement, less pollution to the environment and long service life same as the asphalt stations.
The technical parameters for asphalt stations (NSE)
Scan the QR code to read on your phone
Exploring the Environmental Impact of Grain Storage Silos: A Comprehensive Analysis
Maximizing Efficiency in Grain Storage: The Essential Role of Grain Storage Silos
Innovative Solutions for Preventing Grain Spoilage in Storage Silos
Maximizing Efficiency with Grain Storage Silos: A Comprehensive Guide
Effective Space Management: Optimizing Storage with Feed Silos
Understanding Feed Silos: Essential Storage Solutions for the Transportation and Warehousing Industry

Scan and follow Lu Wei

Scan and follow Xiang Hao

Scan and follow Zhi Xiang
Xiamen Luwei Prefabricated
Steel Structure Co., Ltd Ltd.
Service Hotline:
+86 592-7072928 / +86 18150889219 (Tina Ye) (Overseas)
E-mail:tina.ye@xmlwjx.com
Registered address of the company:
Office Building 3rd Floor, No.608, Xinxia
South Road, Xinxu Town, Xiang'an District, Xiamen City
Factory Address:
E3 workshop, Factory 2nd Floor, No.608, Xinxia South Road, Xinxu Town, Xiang'an District, Xiamen City
Page Copyright: Xiamen Luwei Prefabricated Steel Structure Co., Ltd Ltd. 闽ICP备10205934号
Friendly Link: Alibaba