头部邮箱+阿里巴巴
Welcome to Luwei official website!Tel:+86-592-7072928 E-mail: tina.ye@xmlwjx.com
What are the hard requirements of chain type bucket elevator for the working environment
- Categories:Industry News
- Author:
- Origin:
- Time of issue:2022-10-21
- Views:0
(Summary description)Generally speaking, for the use of chain type bucket elevator, the civil construction on the construction site is basically completed, the on-site garbage cleaning is completed.
What are the hard requirements of chain type bucket elevator for the working environment
(Summary description)Generally speaking, for the use of chain type bucket elevator, the civil construction on the construction site is basically completed, the on-site garbage cleaning is completed.
- Categories:Industry News
- Author:
- Origin:
- Time of issue:2022-10-21
- Views:0
Generally speaking, for the use of chain type bucket elevator, the civil construction on the construction site is basically completed, the on-site garbage cleaning is completed, there is no dust and other pollution, and the ventilation is good. If necessary, an exhaust fan can be used for forced ventilation.
The chain type bucket elevator manufacturer tells you that the on-site lighting must meet the needs of the construction, the use of mobile lighting fixtures and sun lights is prohibited, and the safety warning red lights should be set up at night in dangerous places. The handheld must be a safe voltage light source. Strengthen the erection and inspection of safety facilities before installation, weld safety piles, pull safety ropes, and pull safety nets at necessary parts.
The chain type bucket elevator manufacturer tells you that it is necessary to strengthen the education on the correct use of safety helmets by construction workers, carry out necessary rewards and punishments, and do a good job of conspicuous identification and strict protective measures for the edge of the hole. Trial operation, after the installation is completed, the empty vehicle trial operation should be carried out. Attention should be paid to the idling operation: it cannot be reversed or bumped. The chain type bucket elevator manufacturer tells you that the idle operation is not less than 2 hours, there should be no overheating, the temperature rise of the bearing should not exceed 250℃, and the temperature rise of the reducer should not exceed 300℃. After 2 hours of empty operation, the load test can be carried out when everything is normal. During the test run with load, the feeding should be uniform to prevent excessive feeding and blockage of the lower part.
Scan the QR code to read on your phone
10 Innovative Uses of Steel Structures in Construction
Understanding Steel Structures: The Backbone of Modern Architecture
Understanding the Importance of Steel Structures in Modern Architecture
The Essential Guide to Steel Structures: Benefits and Applications in Modern Construction
Essential Guide to the Top Features to Look for in a Vertical Bucket Elevator
Maximizing Efficiency: The Role of Vertical Bucket Elevators in Industrial Applications
Scan and follow Lu Wei
Scan and follow Xiang Hao
Scan and follow Zhi Xiang
Xiamen Luwei Prefabricated
Steel Structure Co., Ltd Ltd.
Service Hotline:
+86 592-7072928 / +86 18150889219 (Tina Ye) (Overseas)
E-mail:tina.ye@xmlwjx.com
Registered address of the company:
Office Building 3rd Floor, No.608, Xinxia
South Road, Xinxu Town, Xiang'an District, Xiamen City
Factory Address:
E3 workshop, Factory 2nd Floor, No.608, Xinxia South Road, Xinxu Town, Xiang'an District, Xiamen City
Page Copyright: Xiamen Luwei Prefabricated Steel Structure Co., Ltd Ltd. 闽ICP备10205934号
Friendly Link: Alibaba