What should be paid attention to in the installation of bucket elevator conveyor reducer

What should be paid attention to in the installation of bucket elevator conveyor reducer

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2022-03-16
  • Views:0

(Summary description)When installing the reducer of bucket elevator conveyor, it is easy to ignore the throttle baseline problem of the reducer. Therefore, in order to install the reducer better, we need to pay attention to some related matters and problems to ensure the normal operation of the equipment.

What should be paid attention to in the installation of bucket elevator conveyor reducer

(Summary description)When installing the reducer of bucket elevator conveyor, it is easy to ignore the throttle baseline problem of the reducer. Therefore, in order to install the reducer better, we need to pay attention to some related matters and problems to ensure the normal operation of the equipment.

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2022-03-16
  • Views:0
Information

When installing the reducer of bucket elevator conveyor, it is easy to ignore the throttle baseline problem of the reducer. Therefore, in order to install the reducer better, we need to pay attention to some related matters and problems to ensure the normal operation of the equipment. The following bucket elevator conveyor manufacturers to tell you in detail.

Low price bucket elevator conveyor from China manufacturer
The installation reference of the reducer is the rotation centerline and the rotation centerline of the hoist spindle device.
The plane is the joint surface of the reducer body, the cover and the bearing cover.
The bucket elevator conveyor manufacturer tells you that when measuring, you can use the datum plane of the half coupling installed on the spindle head of the elevator, that is, the datum plane drawn from the end face and the radial face, as the measurement datum. When installing the reducer, first clean the reducer mounting seat, remove all debris and dirt on the plane of the reducer base, without oil, rust, dust, etc. Then preliminarily tighten the anchor bolts.
The bucket elevator conveyor manufacturer tells you that before installation, the protective layer of each mating surface of each component of the equipment should be removed, and each surface should be checked. If there is any damage, the high points should be ground off. During installation, a steel wire parallel to the rotation center line of the hoist and on the same vertical plane as the hoist rotation center line should be pulled to the top of the hoist spindle device as a measurement benchmark.
The reducer is placed on the base, the position is roughly adjusted with a wire, and the auxiliary bracket is used for leveling. The coaxiality between the output shaft of the reducer and the rotating shaft of the hoist should be no more than 0.3 mm, and the distance between the shaft ends of the hoist and the reducer should be calibrated to meet the installation requirements of the coupling.
As an important part of the bucket elevator conveyor, the reducer has many problems that need to be paid attention to in the actual installation. For example, during the installation of the reducer, many friends do not know the baseline of the throttle.
In order to reasonably complete the installation of the bucket elevator conveyor reducer, the installation reference of the reducer is the plane where the rotation center line of the hoist spindle device is located, that is, the joint surface of the reducer body, the cover and the upper bearing cover.
During measurement, the datum plane of the half coupling installed on the shaft head of the hoist spindle, that is, the datum plane drawn from the end face and the radial face, can be used as the measurement datum.
The bucket elevator conveyor manufacturer tells you that when installing the reducer, first clean the reducer mounting seat, remove all debris and dirt on the plane of the reducer base, without oil, rust, dust, etc. Then preliminarily tighten the anchor bolts.

Keyword:

Scan the QR code to read on your phone

How 2024-03-25

How to Improve Cleanliness: Effective Dust Control Measures for Cement Bucket Elevators

Learn the best strategies and techniques to enhance cleanliness and control dust in cement bucket elevators. Discover practical tips and solutions for maintaining a clean and efficient industrial envi
See more information
Everything 2024-03-22

Everything You Need to Know About Cement Bucket Elevators

Explore the essential information about cement bucket elevators in the industrial equipment and components - chain and conveyor equipment - elevators industry. Learn about their functions, benefits, a
See more information
The 2024-03-19

The Cost-Saving Benefits of Investing in a Cement Bucket Elevator

Discover how investing in a cement bucket elevator can lead to significant cost savings for your industrial equipment and components business. Learn about the advantages of this innovative technology
See more information
Essential 2024-03-16

Essential Guide to Cement Bucket Elevators in Industrial Equipment

Learn all about cement bucket elevators, an important component in the industrial equipment industry. Discover key information and insights on the role and functionality of these elevators.
See more information
To 2024-03-14

To celebrate the 2024 Women's Day

The spring breeze in March is slightly beautiful, the genial sunshine is warm, in the spring full of hope and warmth, 3.8 omen's Day quietly comes, let us pay tribute to the name of flowers, to all the women.
See more information
Maximizing 2024-03-13

Maximizing Production Efficiency with Buckets Elevator in Metallurgical Machinery

Discover how incorporating a buckets elevator in your metallurgical machinery can revolutionize your production process and significantly increase efficiency.
See more information
On Line
Telephone communication
Service time:
8:30 - 19:00
Advisory
在线客服
Hi, how can I help you?Tina Ye
Luwei

Scan and follow Lu Wei

Xianghao

Scan and follow Xiang Hao

志翔

Scan and follow Zhi Xiang

Xiamen Luwei Prefabricated

Steel Structure Co., Ltd Ltd.

 Service Hotline:

+86 592-7072928 / +86 18150889219 (Tina Ye) (Overseas)

E-mail:tina.ye@xmlwjx.com

Registered address of the company:

Office Building 3rd Floor, No.608, Xinxia

South Road, Xinxu Town, Xiang'an District, Xiamen City

Factory Address:

            E3 workshop, Factory 2nd Floor, No.608, Xinxia South Road, Xinxu Town, Xiang'an District, Xiamen City

Page Copyright: Xiamen Luwei Prefabricated Steel Structure Co., Ltd Ltd.   闽ICP备10205934号  

Friendly Link: Alibaba